Tickets to reviewed PRs
Takes work from idea to shipped PR. For product owners, plan-backlog turns an idea or brief into a well-formed backlog (epics, user stories with acceptance criteria) in your tracker. More
Skills 12 in the ChatGPT listing
Coverage check Run the repo's unit tests with coverage and verify that every file touched in the current change keeps line, branch, and function coverage at or above 95%. Create pr Create a branch, commit the work, and open a pull request for a completed user story, after all quality gates pass. Dev kit setup First-use bootstrap for the dev kit. E2e generate Create or update end-to-end tests for a user-facing flow that changed, using whatever e2e framework the repo already uses. Figma fetch Extract frame/component structure and all visible text from a Figma design URL. Fix pr Resolve the findings on an existing pull request - review comments, CI failures, and self-review findings - driving each to a decision (fix / defer to a tracked issue / discard), re-verifying the gates, replying to each reviewer, and watching for late feedback. Follow ups Turn the loose ends a finished story leaves — out-of-scope notes, deferred review findings, deliberate TODOs — into tracked follow-up work items in the team's tracker, linked to the source story, after approval. Issue fetch Fetch a work item (summary, status, description, acceptance criteria, comments) from the team's issue tracker and display a clean summary. Issue update Update the work item after delivery - comment the PR link and a product-facing summary, and transition it to the team's review status. Plan backlog Turn an idea or description (in any format) into a well-formed backlog — epics, user stories with acceptance criteria, sub-tasks — and create it in the team's tracker after approval. Pr review Structured review of a pull request or the current diff - correctness, contract drift, security, missing tests, coverage gate - producing classified findings and a verdict. Work story Work a user story end to end — fetch the ticket, plan (with approval), implement, verify the applicable gates, self-review, open the PR, and update the tracker.